Feature | Traditional Unit | Griffin 2050 |
---|---|---|
F.E.A. designed | no | Yes, to exceed craning operations in 2m H’s and F6 with a safety factor of 2 |
Single point lift | no | yes |
Certified for lifting | yes | yes |
Removable waste tank | no | yes |
100% sealed tank | no | yes |
DIN 16194 compliant waste tank | no | yes |
Cabin 100% sealed from waste in the event of knockdown | no | yes |
Sealed tank vent | for transit only | yes |
Bunded floor | no | yes |
Cabin removed for service onshore | yes | no |
External framework | yes | no |
Monocoque construction | no (pop riveted panels) | yes |
Hot water hand wash | no | yes |
Rotamoulded one piece construction | no | yes |
Corrosion resistant | no | yes |
Marine toilet | no | yes |
Embedded wheels for positioning | no | yes |
Griffin Special Projects Ltd
Beacon Innovation centre, Beacon Park, Gorleston, Great Yarmouth, NR31 7RA